■How to Mount Special Bushing
|
 |
Align the shank-fastening screw hole with setting mark,
insert the special bushing as far as it will go, then secure the
shank-fastening screw. |
| |
■Replacement
of Inner Spring
|
 |
- Remove the steel ball cap screws retaining the steel balls,
and then remove the washers and steel balls inside the main
unit. (2 locations)
- Remove the tool holding portion from the main unit, replace
the spring, apply a thin coating of grease on sliding portion
(tool holding portion), and then return it to the main unit.
 |
When returning the tool holding portion to the main unit, check that there is no dirt, etc.
adhering to the tool holding portion or within the boat-shaped
groove. |
 |
Also check for dirt, etc. within the tool main unit. |
 |
When returning it, align the boat-shaped groove of the tool holding portion with the hole in the cap screw retaining the steel ball, which is on the main unit of the floating holder.
*Recommended grease :Multi-Purpose Lithium Grease(NLGI #2) |
- Insert steel balls and washers then and firmly secure the
cap screw for retaining the steel balls. Use only XEBEC-specified
cap screws for steel balls, as well as Xebec-specified washers
and steel balls.
- After replacing the springs, press the bottom of
the tool holding portion with your fingers, and check to see
that tool holding portion slides 6 mm.
※ Use springs specified by XEBEC (refer
to “inside
spring specification”) or it may result in malfunction
or breakage of the tool.
|
|